Installation example No.11
Tension and carrying support of ABC to household connection on a wall of a building
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 3810033 | CA 16 | Al bracket | 1 | |
2 | 3811625 | PA 25 | Tension supporting clamp for household connection | 1 | |
3 | 1714060 | FZN 60 | Wall bearer with binding thread | Distance gap between vulture and the wail of the building must be at least 0.06M | 1 |
Installation example No.10
Tension support of main ABC line and its entrance to the Substation
Material list necessary for installation :
No | Cone Marking | Products Name | Note | Quantity | pcs. |
1 | 3810013 | CA 1500/2000 | Al bracket | 1 | |
2 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 1 | |
3 | 1710189 | FKV 180/9 | Cable tie | 1 | |
4 | 3422512 | CPTAU 25 | Wall bearer with binding thread | Distance gap between vulture and the wail of the building must be at least 0.06M | 1 |
Installation example No.9
Tension support of main ABC line on the wall of the building ( production plant, workshops…)
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 3810013 | CA 1500/2000 | Al bracket | 1 | |
2 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 1 | |
3 | 1710189 | FkV 180/9 | Cable tie | 1 | |
4 | 1714060 | FZN 60 | Wall bearar with binding thread | Distance gap between vulture and the wail of the building must be at least 0.06M | 1 |
Installation example No.8
Performing the household connection with attaching the conductor with a hook on the wall with the help of the wall bearer
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 3810008 | AC 25 | Steel wail bracket for household connection of ABC | 1 | |
2 | 3811625 | PA 25 | Tension support clamp for household connection | 1 | |
3 | 1714060 | FZN 60 | Wail beaner with binding thread |
Distance gap between vulture and the wail of the building must be at least 0.06M
|
N |
Installation example No.7
Connection of tap-off (separating) line on main ABC line
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x5000M) | 4 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 4 |
3 | 3810021 | ES 1500 | Al bracket with carrying clamp up to 25-95mm² conductor | 1 | |
4 | 3802580 | PC 35-150 | Insulated waterproof connecting clamp FIDOS 35-150 | 4 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 | |
6 | 3810013 | CA 1500/2000 | Al bracket | 1 | |
7 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5mm² | 1 |
Installation example No. 6
Connection of nulti conductor of ABC with post grounding
Material list necessary for installation:
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x5000M) | 2 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 2 |
3 | 3810021 | ES 1500 | Al bracket with carrying clamp up to 25-95mm² conductor | 1 | |
4 | 3802580 | PC 35-150 | Insulated waterproof connecting clamp FIDOS 35-150 | 1 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 | |
6 | 5200031 | Clamp for grounding on post | 1 |
Installation example No. 5
Double tension support of ABC for separating the overhead line under angle greater than 80 degrees
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.79×0.7x5000M) | 4 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 4 |
3 | 3810013 | CA 1500/2000 | Al bracket | 2 | |
4 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 2 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 |
Installation example No. 4
Tension support for ABC on post
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x500M) | 2 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 2 |
3 | 3810013 | CA 1500/2000 | Al bracket | 2 | |
4 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 2 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 |
Installation example No. 3
Angular carrying support of ABC on post
Material list necessary for installation :
No | Code Marking | Productss Name | Note | Quantity | pcs. |
1 | 3810116 | ACO 16 | Steel bracket for installation on post | Kuka ∅16 | 2 |
2 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x5000M) | 2 meters |
3 | 4710220 | A 19 | Clips | 19 mm | 2 |
4 | 3813095 | PA 450/95 | Tension support clamp for LV ABC | 2 | |
5 | 3802579 | PC 481 | Insulated adapter for shorting and grounding with clamp | 4 |
Installation example No. 2
For carrying support of ABC on the post, with clamp that has the network angular movement (cable) up to 30 degree towards the post and up to 50 degree from the post.
Material list necessary for installation:
No. | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0,19×0,7x5000M) | 2 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 4 |
3 | 3810021 | ES 1500 | Al. bracket | 2 | |
4 | 1710189 | FKV 180/9 | Cable tie | 3 |