ABC CABLE instllation examples

RSS
Posts: 21

Installation example No.11

 

Tension and carrying support of ABC to household connection on a wall of a building

06-1

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 3810033 CA 16 Al bracket 1
2 3811625 PA 25 Tension supporting clamp for household connection 1
3 1714060 FZN 60 Wall bearer with binding thread Distance gap between vulture and the wail of the building must be at least 0.06M 1

 

Installation example No.10

 

Tension support of main ABC line and its entrance to the Substation

05-2

Material list necessary for installation :

No Cone Marking Products Name Note Quantity pcs.
1 3810013 CA 1500/2000 Al bracket 1
2 3812079 PA 1500 Tension support clamp for ABC 54-71.5 mm² 1
3 1710189 FKV 180/9 Cable tie 1
4 3422512 CPTAU 25 Wall bearer with binding thread Distance gap between vulture and the wail of the building must be at least 0.06M 1

 

 

Installation example No.9

 

Tension support of main ABC line on the wall of the building ( production plant, workshops…)

05-1

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 3810013 CA 1500/2000 Al bracket 1
2 3812079 PA 1500 Tension support clamp for ABC 54-71.5 mm² 1
3 1710189 FkV 180/9 Cable tie 1
4 1714060 FZN 60 Wall bearar with binding thread Distance gap between vulture and the wail of the building must be at least 0.06M 1

 

Installation example No.8

 

Performing the household connection with attaching the conductor with a hook on the wall with the help of the wall bearer

04-2

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 3810008 AC 25 Steel wail bracket for household connection of ABC 1
2 3811625 PA 25 Tension support clamp for household connection 1
3 1714060 FZN 60 Wail beaner with binding thread
Distance gap between vulture and the wail of the building must be at least 0.06M
N

 

Installation example No.7

 

Connection of tap-off (separating) line on main ABC line

04-1

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0.19×0.7x5000M) 4 meters
2 4710320 A 20 Clips 19 mm 4
3 3810021 ES 1500 Al bracket with carrying clamp up to 25-95mm² conductor 1
4 3802580 PC 35-150 Insulated waterproof connecting clamp FIDOS 35-150 4
5 1710189 FKV 180/9 Cable tie 3
6 3810013 CA 1500/2000 Al bracket 1
7 3812079 PA 1500 Tension support clamp for ABC 54-71.5mm² 1

 

 

Installation example No. 6

 

Connection of nulti conductor of ABC with post grounding

03-2

Material list necessary for installation:

No Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0.19×0.7x5000M) 2 meters
2 4710320 A 20 Clips 19 mm 2
3 3810021 ES 1500 Al bracket with carrying clamp up to 25-95mm² conductor 1
4 3802580 PC 35-150 Insulated waterproof connecting clamp FIDOS 35-150 1
5 1710189 FKV 180/9 Cable tie 3
6 5200031 Clamp for grounding on post 1

 

Installation example No. 5

 

Double tension support of ABC for separating the overhead line under angle greater than 80 degrees

03-1

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0.79×0.7x5000M) 4 meters
2 4710320 A 20 Clips 19 mm 4
3 3810013 CA 1500/2000 Al bracket 2
4 3812079 PA 1500 Tension support clamp for ABC 54-71.5 mm² 2
5 1710189 FKV 180/9 Cable tie 3

 

Installation example No. 4

 

Tension support for ABC on post

02-2

 

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0.19×0.7x500M) 2 meters
2 4710320 A 20 Clips 19 mm 2
3 3810013 CA 1500/2000 Al bracket 2
4 3812079 PA 1500 Tension support clamp for ABC 54-71.5 mm² 2
5 1710189 FKV 180/9 Cable tie 3

 

Installation example No. 3

 

Angular carrying support of ABC on post

02-1

 

Material list necessary for installation :

No Code Marking Productss Name Note Quantity pcs.
1 3810116 ACO 16 Steel bracket for installation on post Kuka ∅16 2
2 4710080 F 207 Stainless steel band (0.19×0.7x5000M) 2 meters
3 4710220 A 19 Clips 19 mm 2
4 3813095 PA 450/95 Tension support clamp for LV ABC 2
5 3802579 PC 481 Insulated adapter for shorting and grounding with clamp 4

Installation example No. 2

 

For carrying support of ABC on the post, with clamp that has the network angular movement (cable) up to 30 degree towards the post and up to 50 degree from the post.

01-2

 

Material list necessary for installation:

No. Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0,19×0,7x5000M) 2 meters
2 4710320 A 20 Clips 19 mm 4
3 3810021 ES 1500 Al. bracket 2
4 1710189 FKV 180/9 Cable tie 3

 

Page 2 of 3«123»