Installation example No.9
Tension support of main ABC line on the wall of the building ( production plant, workshops…)
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 3810013 | CA 1500/2000 | Al bracket | 1 | |
2 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 1 | |
3 | 1710189 | FkV 180/9 | Cable tie | 1 | |
4 | 1714060 | FZN 60 | Wall bearar with binding thread | Distance gap between vulture and the wail of the building must be at least 0.06M | 1 |