Installation example No.14
Transfering from non-insulated overhead line to ABC
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x5000M) | 2 meters |
2 | 4710320 | A 20 | Clips | 19mm | 2 |
3 | 3810013 | CA 1500/2000 | Al bracket | 1 | |
4 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 1 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 | |
6 | 3802525 | NF 25-150 | Insulated waterproof clamp for trasfering from non-insulated conductor to ABC NF 25-150 | 4 | |
7 | 3801525 | NF 2.5-150 | Insulated waterproof clamp for trasfering from non-insulated conductor to ABC NF 2.5-150 | 1 |