1234

Installation example No.14

 

Transfering from non-insulated overhead line to ABC

07-2

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0.19×0.7x5000M) 2 meters
2 4710320 A 20 Clips 19mm 2
3 3810013 CA 1500/2000 Al bracket 1
4 3812079 PA 1500 Tension support clamp for ABC 54-71.5 mm² 1
5 1710189 FKV 180/9 Cable tie 3
6 3802525 NF 25-150 Insulated waterproof clamp for trasfering from non-insulated conductor to ABC NF 25-150 4
7 3801525 NF 2.5-150  Insulated waterproof clamp for trasfering from non-insulated conductor to ABC NF 2.5-150 1
2021 © Feman Jagodina