Installation example No.19
Connection on the building with entrance through the measuring-distribution enclosure- electric meter
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 3810008 | AC 25 | Steel wall bracket for household connection of ABC | 1 | |
2 | 3813025 | PA/PS 416/35 | Tension support clamp for LV ABC | 2 | |
3 | 5082030 | MRO 1 | Measuring-distribution polyester enclosure 320x665x235 | 1 | |
4 | 1714060 | FZN 60 | Wall bearer with binding thread | Distance gap between vulture and the wail of the building must be at least 0.06M | 3 |