Installation example No. 1

 

Tension support and connection of overhead lines – ABC with cable line.

01-1

Material list necessary for installation :

No. Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0,19×0,7x5000M) 4 meters
2 4710320 A 20 Clips 19 mm 4
3 3810013 CA 1500/2000 Al. bracket 1
4 3812079 PA 1500 Clamp for tension support ABC 54/71,5 mm² 1
5 1710189 FKV 180/9 Cable tie 3
6 3405050 MJPT 50 FID jointing sleeve for phase conductors 3
7 3415454 MJPT 54 N FID jointing sleeve for phase conductors 1

 