Installation example No.7
Connection of tap-off (separating) line on main ABC line
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x5000M) | 4 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 4 |
3 | 3810021 | ES 1500 | Al bracket with carrying clamp up to 25-95mm² conductor | 1 | |
4 | 3802580 | PC 35-150 | Insulated waterproof connecting clamp FIDOS 35-150 | 4 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 | |
6 | 3810013 | CA 1500/2000 | Al bracket | 1 | |
7 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5mm² | 1 |