Installation example No. 2
For carrying support of ABC on the post, with clamp that has the network angular movement (cable) up to 30 degree towards the post and up to 50 degree from the post.
Material list necessary for installation:
No. | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0,19×0,7x5000M) | 2 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 4 |
3 | 3810021 | ES 1500 | Al. bracket | 2 | |
4 | 1710189 | FKV 180/9 | Cable tie | 3 |