Yearly archives: 2015

Entries found: 10

HEATING AND COOLING OF YOUR HOME-OFFICE SPACE WITH HEAT PUMPS AND SOLAR COLLECTORS ENERGY

The greatest installed power from 186 kW with solar collectors and heat pumps in Serbia!

Solar energy is the only inexhaustible source of warm energy.

In the period when there is not enough of sun energy, solar collectors are used in combination with heat pumps.

These types of systems are used for heating and cooling domestic homes, office space, swimming pools, green houses etc. The solar collectors combined with the heat pumps secure the biggest possible degree on energy saving and energy efficiency up to 75%.

Beside the big energy saving, these systems do not produce any harmful elements that endanger the environment such as wood fired cauldron, coal, gas, oil etc.

Installation guide Installation guide

  1. Solar collectors
  2. Heat pump water-water
  3. Well 1 and well 2
  4. Horizontal geothermal collector
  5. Heat pump air-water
  6. Fan coiler mural
  7. Fan coiler – ceiling
  8. Pump
  9. Boiler
  10. Hot water

Installation example No.21

 

Connection of insulated conductors ABC in the range

11-14

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 3417070 MJPT 70N FID-N jointing sleeves for conductors-zero conductor 4

 

 

Installation example No.20

 

Connection of insulated conductors ABC in the range

10-2

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 3415454 MJPT 54 N FID jointing sleeves for phase conductors 1
2 3402525 MJPT 25 FID jointing sleeves for phase conductors 1
3 3405050 MJPT 50 FID jointing sleeves for phase conductors 3
4 1710189 FKV 180/9 Cable tie 2

Installation example No.19

 

Connection on the building with entrance through the measuring-distribution enclosure- electric meter

10-14

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 3810008 AC 25 Steel wall bracket for household connection of ABC 1
2 3813025 PA/PS 416/35 Tension support clamp for LV ABC 2
3 5082030 MRO 1 Measuring-distribution polyester enclosure 320x665x235 1
4 1714060 FZN 60 Wall bearer with binding thread Distance gap between vulture and the wail of the building must be at least 0.06M 3

 

Installation example No.18

 

Angular carrying support of the main ABC line and separating for household connection

04-1

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0.19×0.7x5000M) 4 meters
2 4710320 A 20 Clips 19 mm 4
3 3810021 ES 1500 Al bracket with clamp for carrying support up to 25-95mm² conductor 1
4 3804350 PC 4-150 Insulated waterproof connecting clamp FIDOS 4-35/6-150 2
5 1710189 FKV 180/9 Cable tie 3
6 3810013 CA 1500/2000 Al bracket 1
7 3811625 PA 25 Tension support clamp for household connection 1

 

Installation example No.17

 

Tension binding of ABC to household connection, when the distance between the posts is greater than standard

09-111

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 3100074 PSK 7 Hock PSK 7 ∅ 16 1
2 3813025 PA/PS 416/35 Tension support clamp for LV ABC 2

 

Installation example No.16

 

Tension binding of ABC to household connection, when the distance between the posts is greater than standard.

08-211

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0.19×0.8x5000M) 2 meters
2 4710320 A 20 Clips 19 mm 2
3 3810013 CA 1500/2000 Al bracket 1
4 3811625 PA 25 Tension support clamp for household connection 2
5 1710189 FKV 180/9 Cable tie 2

 

Installation example No.15

 

Separation of ABC for household connection from non-insulated overhead line

07-2

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 3811625 PA 25 Tension supporting clamp for household connection 1
2 3801525 N.F 2.5-150 Insulated waterproof clamp for transfering from non-insulated conductor to ABC NF 2.5-150 2

Installation example No.14

 

Transfering from non-insulated overhead line to ABC

07-2

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 4710080 F 207 Stainless steel band (0.19×0.7x5000M) 2 meters
2 4710320 A 20 Clips 19mm 2
3 3810013 CA 1500/2000 Al bracket 1
4 3812079 PA 1500 Tension support clamp for ABC 54-71.5 mm² 1
5 1710189 FKV 180/9 Cable tie 3
6 3802525 NF 25-150 Insulated waterproof clamp for trasfering from non-insulated conductor to ABC NF 25-150 4
7 3801525 NF 2.5-150  Insulated waterproof clamp for trasfering from non-insulated conductor to ABC NF 2.5-150 1

Installation example No.13

 

Example of connecting the street light on ABC

07-1

Material list necessary for installation :

No Code Marking Products Name Note Quantity pcs.
1 3100074 PSK 7 Hook PSK ∅16 1
2 3810015 RA 25 Angular carrying support clamp 1
3 1710189 FKV 180/9 Cable tie 1
4 3801595 PC 10-95 Insulated waterproof connecting clamp FIDOS 105-10/16-95 2
5 LED light 30W. 60W. 90W 1
6 4710080 F 207 Stainless steel band (0.19×0.7x5000M) 2 meters
7 4710320 A 20 Clips 19mm 2

 

Page 2 of 42«12345»102030...Last »
2021 © Feman Jagodina