Installation example No.12
Example of connecting the street light on ABC
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quentity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x65000M) | 4 meters |
2 | 4710320 | A 20 | Clips | 19mm | 4 |
3 | LED light | 30W,60W,90W | 1 | ||
4 | 3804350 | PC 4-150 | Insulated waterproof connecting clamp FIDOS 4-35/6-150 | 2 | |
5 | 1710189 | FKV 180-9 | Cable tie | 4 | |
6 | 3810021 | ES 1500 | Al bracket with carrying support clamp up to 25-95mm² conductor | 1 |
Installation example No.11
Tension and carrying support of ABC to household connection on a wall of a building
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 3810033 | CA 16 | Al bracket | 1 | |
2 | 3811625 | PA 25 | Tension supporting clamp for household connection | 1 | |
3 | 1714060 | FZN 60 | Wall bearer with binding thread | Distance gap between vulture and the wail of the building must be at least 0.06M | 1 |
Installation example No.10
Tension support of main ABC line and its entrance to the Substation
Material list necessary for installation :
No | Cone Marking | Products Name | Note | Quantity | pcs. |
1 | 3810013 | CA 1500/2000 | Al bracket | 1 | |
2 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 1 | |
3 | 1710189 | FKV 180/9 | Cable tie | 1 | |
4 | 3422512 | CPTAU 25 | Wall bearer with binding thread | Distance gap between vulture and the wail of the building must be at least 0.06M | 1 |
Installation example No.9
Tension support of main ABC line on the wall of the building ( production plant, workshops…)
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 3810013 | CA 1500/2000 | Al bracket | 1 | |
2 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 1 | |
3 | 1710189 | FkV 180/9 | Cable tie | 1 | |
4 | 1714060 | FZN 60 | Wall bearar with binding thread | Distance gap between vulture and the wail of the building must be at least 0.06M | 1 |
Installation example No.8
Performing the household connection with attaching the conductor with a hook on the wall with the help of the wall bearer
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 3810008 | AC 25 | Steel wail bracket for household connection of ABC | 1 | |
2 | 3811625 | PA 25 | Tension support clamp for household connection | 1 | |
3 | 1714060 | FZN 60 | Wail beaner with binding thread |
Distance gap between vulture and the wail of the building must be at least 0.06M
|
N |
Installation example No.7
Connection of tap-off (separating) line on main ABC line
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x5000M) | 4 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 4 |
3 | 3810021 | ES 1500 | Al bracket with carrying clamp up to 25-95mm² conductor | 1 | |
4 | 3802580 | PC 35-150 | Insulated waterproof connecting clamp FIDOS 35-150 | 4 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 | |
6 | 3810013 | CA 1500/2000 | Al bracket | 1 | |
7 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5mm² | 1 |
Installation example No. 6
Connection of nulti conductor of ABC with post grounding
Material list necessary for installation:
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x5000M) | 2 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 2 |
3 | 3810021 | ES 1500 | Al bracket with carrying clamp up to 25-95mm² conductor | 1 | |
4 | 3802580 | PC 35-150 | Insulated waterproof connecting clamp FIDOS 35-150 | 1 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 | |
6 | 5200031 | Clamp for grounding on post | 1 |
Installation example No. 5
Double tension support of ABC for separating the overhead line under angle greater than 80 degrees
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.79×0.7x5000M) | 4 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 4 |
3 | 3810013 | CA 1500/2000 | Al bracket | 2 | |
4 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 2 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 |
Installation example No. 4
Tension support for ABC on post
Material list necessary for installation :
No | Code Marking | Products Name | Note | Quantity | pcs. |
1 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x500M) | 2 meters |
2 | 4710320 | A 20 | Clips | 19 mm | 2 |
3 | 3810013 | CA 1500/2000 | Al bracket | 2 | |
4 | 3812079 | PA 1500 | Tension support clamp for ABC 54-71.5 mm² | 2 | |
5 | 1710189 | FKV 180/9 | Cable tie | 3 |
Installation example No. 3
Angular carrying support of ABC on post
Material list necessary for installation :
No | Code Marking | Productss Name | Note | Quantity | pcs. |
1 | 3810116 | ACO 16 | Steel bracket for installation on post | Kuka ∅16 | 2 |
2 | 4710080 | F 207 | Stainless steel band | (0.19×0.7x5000M) | 2 meters |
3 | 4710220 | A 19 | Clips | 19 mm | 2 |
4 | 3813095 | PA 450/95 | Tension support clamp for LV ABC | 2 | |
5 | 3802579 | PC 481 | Insulated adapter for shorting and grounding with clamp | 4 |